Home About Us Vision Management Salient Features Why JNPC Support SEZ-Pharma Gallery News Letter Contact Us
 
Why JNPC

JNPC CAN SAVE UPTO 40% OF THE PROJECT COST

  • Save two years time and money
    1. At JNPC all required permissions are in place. Industries can start just with their product approval.
    2. In no time and without any hassles the industries can expand their production or opt an alternative product line.
    3. All Services assured by Ramky. Therefore Management can focus on core business activities.


  • 30% saving in Capital Investment
    1. Save 30% investment on additional Land. (Ready Built Common Effluent Treatment Plant for the Park equipped with modern technology.)
    2. Reduction on Manpower costs & maintenance costs


  • 5% saving on Water Supply & Storage Investment (* Based on illustration)
    1. Continuous treated water supply through Godavari river and summer storage balancing reservoir
    2. Good quality water as per the IS 10500 standards.
    3. Saving on investment for water storage as the water is supplied through conveyance lines


  • 5% saving in Common Services/ facilities
    1. Equipped Central cafeteria
    2. Emergency Medical centre with ambulance in operation
    3. Equipped Fire Tender to fight chemical and hazardous calamities
    4. Bank/Post-office/Telephone/ Power/Fuel & Weigh Bridge are in operation
    5. All weather illuminated Roads
    6. Dedicated power feeders with transmission network to the door-step to the Industry
    7. Exclusive ready built space for individual R&D purpose
    8. Well furnished Guest Rooms & Club House

CASE STUDY COMPARISON (Illustration)

In result a total saving of INR 20.39 Crores (40%) in capital investment & annual saving of Rs 1 crore on variable costs.

 
(Rs. in Crores)
Nature of Expenditure Outside
JNPC-RPCIL
In
JNPC-RPCIL
Saving in to be JNPC-RPCIL member Remarks
Land (including ETP, Greenbelt) 10 7 3 Since there is no requirement of additional land for a separate ETP and separate greenery cost on 3 acres land
Investment on Plant & Machinery
Including ETP & Disposal
35 25 10 10 Crore saving due to availability
of ETP Plant, Land fill for Solid waste disposal and Greenbelt
Interest & depreciation 2 0 2 Interest on additional land & ETP investment
Replacement costs on plant
and machinery
0.6 0 0.6 No ETP and no replacement
Environmental Clearances

0.1

0.01 0.09 Initial approval cost for MOEF/CPCB/APPCB
Water Storage & Treatment 0.5 0 0.5 50lakh saving due to availability
of uninterrupted treated water supply
Common Services 3.5 0 3.5 3.5 Crore saving due to well
developed Infrastructure & services
Variable Cost: U U U Variable cost saving per month
Manpower Cost 0.5 0 0.5 50 lakhs saving in additional manpower cost to run ETP, Water, Cafeteria, Fire Tender etc.
Better Time Management 0.5 0 0.5 50 lakhs saving due to ready made ETP, Landfill, Uninterrupted Power supply & other common services
(Figures rounded to nearest number) 53 32 20 Capital cost saving
 
Estimates based on certain assumptions and subject to change from time to time.

DESIGNED TO ASSURE WORLD-CLASS FACILITIES BY EXPERTS IN THE DOMAIN

 
Company Logo Name of the Company Process
JTC Corporation- JURONG, Singapore Design & Master Planning
Price Water House Coopers Consultant & Advisor for SEZ
Ernst & Young Marketing Associates
Bureau Veritas Design Reviews and Inspection
RICPL Common Effluent Treatment Plant.
Ramky Enviro Engineers Limited Hazardous Waste Management facility
National Institute of Oceanography (NIO). Rapid Environment Impact Marine Outfall Assessment Studies
 
 

TANGIBLE & INTANGIBLE GAINS

  • The advent of Pharma City has changed the face of surrounding villages, Lankalapalem and entire Paravada Mandal.
  • Capital Investments
  • Industrialization
  • Generation of Employment
  • Heavy Earth Excavation Equipment like JCB’s Dozers, Terex, EX 210 etc are being hired by the industry from the local people, thus creating employment to many Operators, Drivers, cleaners, mechanics etc.
  • Similarly as above, the companies who are in production are operating many Buses, Taxis, Cars etc for transporting their employees creating employment to the Operators of Buses, Taxis, Drivers, cleaners, supporting staff etc.
  • Biggest employment potential to Private Security Agencies as all the existing companies have engaged their own security agencies. At present there are nearly 500 security guards are working out this more than 50% (250) are from local village hamlets.
  • The supporting and ancillary industries that supplies Spares, Consumables by products etc are providing employment to many people.
  • Housing projects in the surrounding areas have increased to accommodate the employees of Pharmacity. These projects are creating employment to construction labour.
  • The developments of new colonies are providing new business opportunities to the small vendors of grocery, cloth, electrical etc.
  • There are many canteens ranging from Tea Stall to Good Hotels have opened to cater the food requirements of the employees.
  • Mutha Labourers are the scarce commodity now a days, is the clear evidence of employment creation.
  • Increase in revenue to government by way of different taxes like, Service Tax, VAT, Income Tax, Local taxes etc.
  • The units also contributing to revenue of VUDA/ IALA for their plan approvals.
  • One exclusive Sub Registrar Office for registration of Plots has been created and the office is generating considerable amount of Stamp Duty and Registration fee from the member industries.
  • The increased construction activity has created new opportunities to Building Material dealers, Miners of minor minerals, Cement, Steel and other peripheral operators.
 
 

WELL DESIGNED LAYOUT WITH ADEQUATE GREEN BELT FOR A STIMULATING WORK ENVIRONMENT

 
 
 

WELL CONNECTED TO AIR, ROAD AND SEA REDUCING COST OF TRANSPORTATION

 
 
Location : Parawada – 33 Km South of Visakhapatnam
Major Road : National Highway 5 (NH5) – 2 Km away from the northern
part of boundary
Access Road : 4 Lane road connecting NH5
Airport : 20 Km from Visakhapatnam
Port : 25 Km from Visakhapatnam & 20 Km to the Gangavaram
Railways : South Central Railway at Duvvada – 8 Km
Industries around JNPC : - Simhadri Thermal Power Station (NTPC)
- Visakhapatnam Steel Plant
- Brandix, HPCL & BARC
 
 
 
 