Salient Features
 
 
Common Effluent Treatment Plant

Capacity : 12 MLD

  • Separate Low TDS & High TDS effluent conveyance Pipe Line Network
  • Air Strippers for removal of Volatile Organic Compounds
  • Incinerator / regenerative thermal Oxidiser for destruction of VOC’s
  • Fully automated Cyclic Biological Activated Sludge Treatment Plant
  • Separate Treatment facilities for Handling Cyanides, Heavy Metals & other wastes
  • Powdered activated carbon treatment
  • Guard ponds for toxicity check
  • Marine Outfall Pipelines - disposal of treated effluents
Top
 
Hazardous Waste Management Facility
  • Double Composite GeoTextile HDPE Liners
  • Meets US Environmental Protection Act (USEPA) Specifications
  • Secured Engineered Landfill
Top
 
Incineration System

Capacity : 5.5 Mkcals/hour Capable to handle

  • Bulk solids
  • Tarry wastes
  • Semisolids
  • Heat recovery system
  • Energetic liquid collecting from various industries
Top
 
Water Treatment Plant

Capacity: 20 MLD

  • Raw water received from Yeleru canal is treated to supply of potable water which meets the IS 10500 standards to all industries in JNPC. (The water is being drawn from perinnial river Godavari)
  • Distribution through HDPE pipe line network up to the receiving point of industry.
  • Capacity of Raw Water and Treated Water Pumping System in JNPC Water Treatment Plant is 1,000 M3 per Hour.
Top
 
Services in operation:
  • Central cafeteria
  • Emergency Medical Centre with ambulance operating round-the-clock with doctors and supporting staff
  • Fire Station with trained crew and Fire Tender to fight any chemical and hazardous calamities
  • Bank with ATM & Post-office
  • Telephone Exchange with high speed Broadband Internet facility
  • Fully functional Weigh Bridge
  • Exclusive Police Out Post
  • Fuel dispensing station
  • Excellent Roads with street lighting
  • Dedicated power feeders(11kV / 33KV) with transmission network to the door-step of the Industry
  • Exclusive ready built space for individual R&D purpose
  • Well furnished Guest Rooms & Club House
Top
 
Physical Infrastructure:
  • 971.66 Hectares Industrial Park
  • 32 Km long All Weather Road Network
  • 40 Km Effluent Collection & Conveyance system
  • 34Km Water Pipeline Network
  • 16Km each, 2 Nos Cross-Country pipe lines
  • 62 Km Power Distribution Network
  • 2 Electrical Sub-Stations (33KV/11KV)
  • 747 Electrical Poles
  • 1095 Street Light poles
  • Dedicated power feeders with transmission network to the door-step of the Industry
  • Water Reservoirs & Tanks
  • 1000 ML capacity Summer Storage Tank
Top
 
Environment Infrastructure:
  • 143 Hectares well developed Green belt in and around Pharma City
  • 12 MLD Capacity Effluent Treatment Plant with Multiple Effect Evaporator
  • Hazardous Waste Management
  • Secured Landfill 2 lacs TPA
  • Incinerator of 5.5 MKCal
  • 20 MLD Water Treatment Plant
  • 2 Marine outfall On-Shore pipelines (16Km each)
  • 2 Marine outfall Off-Shore pipelines (1.7 Km each)
  • Exclusive ready built space for individual R&D purpose
Top
 
Civil Infrastructure:
  • Facilitation Block
  • Well furnished Guest Rooms & Club House
  • Prestigious Entrance Plaza
  • Well designed R&D Block
  • Excellent Spacious buildings for Cafeteria
  • Exclusive well designed block for Bank-Post office-Telephone-utilities
  • Large Shopping Arcade
  • Designed to suit Admin blocks for CETP,WTP and Substations
Top
 
Common Solvent Recovery Plant
  • 5 - Batch type Solvent Distillation cum Recovery columns are installed to cater to the member industries for handling spent solvent.
  • This will reduce the capital investment for the member industries
Top
 
Social Infrastructure:
  • Exclusive Housing Colony in near proximity
  • Facilities to empower rehabilitees and provide community support through Ramky Foundation
  • Emergency Medical centre with ambulance
  • Fire Tender to fight chemical and hazardous calamities
  • Facilities of banking, shopping, communication & Fuel dispensing station
  • 13,000 plus people employed so far and opportunity for another 16,000 people for direct and indirect employment.